Substation · England, United Kingdom
Kings Lynn South Grid 33kV Substation
Kings Lynn South Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 5.5 MVA of demand headroom and 9.8 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 5.5 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 9.8 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 48.5 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.7315, 0.4030 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 302 power plants (128 operating, 5,297 MW), 146 grid connections (104 operating, 1,871 MW), 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| (ANM) Hamlin Way grid connection | Grid connection | 20 MW | Planned | 0.4 km |
| Willows power and recycling centre (EfW) | Power plant | 24.2 MW | Cancelled | 1.1 km |
| Palm Paper 3 CCGT Power station Kings Lynn | Power plant | 162 MW | Permitted | 1.3 km |
| Kings Lynn | Power plant | 395 MW | Operating | 1.4 km |
| FDG C-05 Palm Paper grid connection | Grid connection | 30 MW | Operating | 1.5 km |
| Kings Lynn Power Station grid connection | Grid connection | 350 MW | Operating | 1.7 km |
| Kings Lynn B Connection Project | Transmission line | — | Permitted | 2.5 km |
| Longmarsh Green Energy | Data center | — | Planned | 4.3 km |
| Positive Park | Data center | — | — | 29 km |
Grid operator and place
More from Eastern Power Networks plc
- Canvey Primary 11kVsubstation
- Thorley Primary 11kVsubstation
- Peterborough South Grid 11kVsubstation
- Westbury Primary 11kVsubstation
- Laxfield Primary 11kVsubstation
- Fulbourn Grid 33kVsubstation
- Earlham Grid 33kVsubstation
- Hunstanton Primary 11kVsubstation
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.