Substation · England, United Kingdom

Wycombe Marsh Primary

Wycombe Marsh Primary is a 33 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 12 / 24MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromAmersham GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromLoudwater BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.6185, -0.7219SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 375 power plants (121 operating, 1,673 MW), 164 grid connections (80 operating, 866 MW), 127 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Derehams Farm grid connectionGrid connection100 MWPlanned2.1 km
Loudwater grid connectionGrid connection40 MWOperating2.1 km
Derehams Farm, Derehams Lane - Battery StoragePower plant40 MWOperating2.3 km
Derehams Farm, Derehams Lane - Battery StoragePower plant126 MWPlanned2.3 km
Coldmoorholme Lane Battery StoragePower plant7.2 MWCancelled3.8 km
CapitaLand Ascendas REIT data center, High WycombeData center——3.9 km
Little Marlow Twul PV grid connectionGrid connection1.5 MWPlanned4.2 km
SDC M40 CampusData center—Planned9.5 km
Spectrum HouseData center——10.0 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page