Power plant · North Yorkshire, England, United Kingdom

Wormald Green - Battery Energy Storage System

Wormald Green - Battery Energy Storage System is a power plant in North Yorkshire, England, United Kingdom, with 33 MW of capacity, operated by Harmony Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressStation Lane Burton Leonard, HG3 3RXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2024DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Jun 2022 (permit 22/00777/FUL, Town and Country Planning Act, issued by North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Mar 2022 (reference 22/00777/FUL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Sept 2022 (refused, reference 22/00777/FUL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Jun 2022 (granted, reference 22/00777/FUL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarmony Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity33 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.0761, -1.5201DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit refused (planning authority North Yorkshire, reference 22/00777/FUL)
  3. Permit granted (planning authority North Yorkshire, reference 22/00777/FUL)
  4. Permit applied for (planning authority North Yorkshire, reference 22/00777/FUL)

How it compares

Wormald Green - Battery Energy Storage System is the 364th-largest of 3,430 power plants in England and the 687th-largest of 5,050 in the United Kingdom by capacity; its 33 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England364th of 3,43071,965 MW<0.1%
United Kingdom687th of 5,050115,622 MW<0.1%
All power plants in our data2,641st of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 255 grid connections (127 operating, 1,287 MW), 238 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wormald Green 132/11kV DirectSubstation——0.2 km
Wormald Green 132/33kVSubstation——0.2 km
Battery storage and Solar 16 MW grid connection at Wormald Green 132/11kV DirectGrid connection16 MWPlanned0.4 km
Solar 24 MW grid connection at Fawcett PVGrid connection24 MWPlanned1.0 km
Battery storage and Solar 75.5 MW grid connection at Leyton HybridGrid connection75.5 MWOperating1.7 km
KnaresboroughSubstation——5.4 km
VocaLinkData center——12 km
Yorkshire GREENTransmission line—Permitted25 km
GridJetData center——33 km