Grid connection · England, United Kingdom

Marsh House PV grid connection

Marsh House PV grid connection is a grid connection in England, United Kingdom, with 4.09 MW of capacity, held by Morsol Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMARSH HOUSE PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Marsh House PV GEN)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderMorsol LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCoxmoor Wood BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMarsh House Solar Park (matched by name+coordinates+technology, 0.11 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity4.09 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date7 Mar 2015SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.2067, -0.8444SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Marsh House Solar Park
  2. Permit granted: Marsh House Solar Park (appeal granted, planning authority East Hampshire, reference 53234/001)
  3. Permit granted: Marsh House Solar Park (planning authority East Hampshire, reference 53234/001)
  4. Permit refused: Marsh House Solar Park (planning authority East Hampshire, reference 53234/001)
  5. Permit applied for: Marsh House Solar Park (planning authority East Hampshire, reference 53234/001)

How it compares

Marsh House PV grid connection is the 1,817th-largest of 2,533 grid connections in England and the 2,826th-largest of 3,903 in the United Kingdom by capacity; its 4.09 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,817th of 2,533319,370 MW<0.1%
United Kingdom2,826th of 3,903446,745 MW<0.1%
All grid connections in our data6,810th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 295 power plants (115 operating, 980 MW), 262 substations, 93 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Marsh House Solar ParkPower plant5.5 MWOperating0.1 km
Farnham LandfillPower plant2.4 MWOperating1.8 km
Wrecclesham PrimarySubstation——2.0 km
Farnham PrimarySubstation——3.9 km
Penn Croft Farm, Crondall - Battery Energy Storage FacilityPower plant100 MWPermitted4.6 km
Fleet-Bramley GSPSubstation——5.5 km
Data center, England (OSM way 1164817477)Data center——8.8 km
Datum Farnborough Data CentreData center——8.9 km
Ark Data Centres data center, EnglandData center——9.0 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom