Substation · England, United Kingdom

Austin Canons Primary 11kV Substation

Austin Canons Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 1 MVA of demand headroom and 26.5 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Austin Canons Primary 11kV lies
52.1271, -0.4829 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom26.5 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity22.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.1271, -0.4829UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 451 power plants (155 operating, 2,295 MW), 203 grid connections (126 operating, 1,284 MW) and 16 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Bedford Hospital grid connectionGrid connection1.6 MWOperating0.8 km
Elstow Landfill SitePower plant5.5 MWUnder construction1.3 km
Progress Park, Elstow, Site A - Solar PV PanelsPower plant1 MWPermitted2.0 km
Progress Park, Elstow, Site B - Solar PanelsPower plant1 MWPermitted2.0 km
Elstow Landfill Site grid connectionGrid connection1.76 MWOperating2.8 km
Solar 3.48 MW grid connection at Harrowden Primary 11kVGrid connection3.48 MWOperating3.0 km
Pulsant Milton Keynes SE-1Data center——20 km
Data center, England (OSM way 460010263)Data center——20 km
nLighten Milton KeynesData center——25 km