RARE CONTEXT Request research

Grid connection · England, United Kingdom

Elstow Landfill Site grid connection

Elstow Landfill Site grid connection is a grid connection in England, United Kingdom, with 1.76 MW of capacity, held by Renewable Power Generation Ltd.

Map: where Elstow Landfill Site grid connection lies
52.1033, -0.4713 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Austin Canons Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderRenewable Power Generation LtdUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toElstow Landfill Site (matched by name+coordinates+technology+capacity, 0.22 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity1.76 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date21 Jun 1996UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.1033, -0.4713UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Elstow Landfill Site
  2. Permit granted: Elstow Landfill Site (planning authority Bedford)
  3. Permit applied for: Elstow Landfill Site (planning authority Bedford)

How it compares

Elstow Landfill Site grid connection is the 3,125th-largest of 3,539 grid connections in England and the 4,330th-largest of 4,870 in the United Kingdom by capacity; its 1.76 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,125th of 3,539341,715 MW<0.1%
United Kingdom4,330th of 4,870467,981 MW<0.1%
All grid connections in our data8,065th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 456 power plants (159 operating, 2,308 MW), 154 substations and 16 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Elstow Landfill SitePower plant1.8 MWOperating0.2 km
Progress Park, Elstow, Site A - Solar PV PanelsPower plant1 MWPermitted0.8 km
Progress Park, Elstow, Site B - Solar PanelsPower plant1 MWPermitted0.8 km
Harrowden Primary 11kVSubstation——2.2 km
West Bedford Primary 11kVSubstation——2.4 km
Austin Canons Grid 33kVSubstation——2.8 km
Pulsant Milton Keynes SE-1Data center——20 km
Data center, England (OSM way 460010263)Data center——20 km
Starwood HouseData center——23 km

Holder, grid operator and place

More from Renewable Power Generation Ltd

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page