Substation · England, United Kingdom

Canvey Primary 11kV Substation

Canvey Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 7.9 MVA of demand headroom and 22.5 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Canvey Primary 11kV lies
51.5236, 0.5757 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom7.9 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom22.5 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity22.7 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5236, 0.5757UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 358 power plants (151 operating, 8,370 MW), 336 grid connections (240 operating, 2,745 MW), 50 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kings Road grid connectionGrid connection2 MWOperating1.6 km
Land adjacent to the former Coryton RefineryPower plant5 MWCancelled4.4 km
(ANM) SS17 9LL The Manorway grid connectionGrid connection20 MWPlanned4.5 km
Pitsea Landfill SchemePower plant11.6 MWOperating4.5 km
Cleanaway Project 3Power plant27.8 MWPermitted4.6 km
Pitsea Landfill grid connectionGrid connection21 MWOperating5.0 km
CityFibre CabinetsData center——7.0 km
Imperium 315Data center——9.4 km
Fujitsu Data CentreData center——22 km

Grid operator and place

More from Eastern Power Networks plc

Candidate sites around this substation

2 sites of land near Canvey Primary 11kV have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.