Power plant · Bedford, England, United Kingdom

Elstow Landfill Site Solar Farm

Elstow Landfill Site Solar Farm is a solar power plant under construction in Bedford, England, United Kingdom, with 5.5 MW of capacity, operated by Bedford Borough Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBedford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressElstow Landfill Site, Wilstead Road, Elstow, Bedford, MK42 9YUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Nov 2020 (permit 20/01987/FULWM, Town and Country Planning Act, issued by Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Sept 2020 (reference 20/01987/FULWM, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Nov 2020 (granted, reference 20/01987/FULWM, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBedford Borough CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area6.16 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1327, -0.4668DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Bedford, reference 20/01987/FULWM)
  3. Permit applied for (planning authority Bedford, reference 20/01987/FULWM)

How it compares

Elstow Landfill Site is the 1,272nd-largest of 1,650 power plants planned, permitted or under construction in England and the 2,037th-largest of 2,548 in the United Kingdom by capacity; its 5.5 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,272nd of 1,650171,264 MW<0.1%
United Kingdom2,037th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,182nd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 17 data centers, 5 grid connections (1 operating, 4.75 MW) and 2 substations, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Pulsant Milton Keynes SE-1Data center——22 km
Data center, England (OSM way 460010263)Data center——22 km
Starwood HouseData center——24 km
East Claydon GSPSubstation——38 km
Pembridge Farm grid connectionGrid connection131 MWPlanned46 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating48 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned49 km
Cottisford PrimarySubstation——49 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page