Progress Park, Elstow, Site B - Solar Panels is a permitted power plant in Bedford, England, United Kingdom, with 1 MW of capacity, operated by Alan Fall Family Trust managed by Bourse Trustees.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBedford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit A, Progress Park, Elstow, Bedford, MK42 9XEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Dec 2023 (permit 23/02362/SPNJ, Town and Country Planning Act, issued by Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Oct 2023 (reference 23/02362/SPNJ, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Dec 2023 (granted, reference 23/02362/SPNJ, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAlan Fall Family Trust managed by Bourse Trustees (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1101, -0.4752DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Bedford, reference 23/02362/SPNJ)
  2. Permit applied for (planning authority Bedford, reference 23/02362/SPNJ)

How it compares

Progress Park, Elstow, Site B - Solar Panels is the 1,581st-largest of 1,651 power plants planned, permitted or under construction in England and the 2,458th-largest of 2,549 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,581st of 1,651172,174 MW<0.1%
United Kingdom2,458th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data5,691st of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 16 data centers, 5 grid connections (1 operating, 4.75 MW) and 3 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pulsant Milton Keynes SE-1Data center——20 km
Data center, England (OSM way 460010263)Data center——20 km
Starwood HouseData center——23 km
East Claydon GSPSubstation——36 km
Pembridge Farm grid connectionGrid connection131 MWPlanned45 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating47 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned47 km
Cottisford PrimarySubstation——48 km
Cokes Lane PrimarySubstation——50 km

Operator and place

More from Alan Fall Family Trust managed by Bourse Trustees

Other power plants in England

All 5809 power plants in England, United Kingdom