Powered land · United Kingdom

Sites near grid capacity in Stevenage

8 candidate sites near a primary or bulk supply substation with headroom in Stevenage, England, ranked by site score. The highest-scoring is the 1.23 ha brownfield site at The Hyde Neighbourhood Centre, Stevenage, 0.84 km from a substation with 26.9 MVA of demand headroom, at 44 of 100.

Map: 8 sites in Stevenage, one dot each
All 8 on the map.

Sites ranked by score

All 8 ranked sites in Stevenage, scored on area, distance to the substation and its demand headroom. How the site score works in the United Kingdom · Filter these sites

#SiteSubstationAreaTo substationDemand headroomGeneration headroomScore
11.23 ha brownfield site at The Hyde Neighbourhood Centre, StevenageStevenage Grid 33kV1.23 ha0.84 km26.9 MVA105 MVA44
21.62 ha brownfield site at Bedwell Crescent Neighbourhood Centre, StevenageStevenage Grid 33kV1.62 ha0.9 km26.9 MVA105 MVA43
31.81 ha brownfield site at The Oval Neighbourhood Centre, StevenageVerity Way Primary 11kV1.81 ha0.1 km6.3 MVA21.9 MVA35
42.67 ha brownfield site at Longfield Fire and Rescue, StevenageNorth Stevenage Primary 11kV2.67 ha0.74 km9.7 MVA23.4 MVA29
53.8 ha brownfield site at Former Lonsdale School, StevenageVerity Way Primary 11kV3.8 ha1.05 km6.3 MVA21.9 MVA21
61.39 ha brownfield site at The Glebe Neighbourhood Centre, StevenageVerity Way Primary 11kV1.39 ha1.22 km6.3 MVA21.9 MVA18
72.55 ha brownfield site at Rugby Club, North Road, StevenageNorth Stevenage Primary 11kV2.55 ha1.53 km9.7 MVA23.4 MVA17
81.38 ha brownfield site at Matalan, StevenageStevenage Primary 11kV1.38 ha1.4 km5.9 MVA12.2 MVA15

Search links for AI assistants

The sites in Stevenage as plain links an assistant can open: each answer lists the sites with their facts and page, and links to narrower and wider searches with how many sites each finds.

How to give them to Claude or ChatGPT: the API page.

Owners and grid capacity for these sites.For the 8 sites in Stevenage: who owns each one, the free capacity at its substation and its planning status, on request.