RARE CONTEXT Request research

Powered land · United Kingdom

Sites near grid capacity in Cheshire East

5 candidate sites near a primary or bulk supply substation with headroom in Cheshire East, England, ranked by site score. The highest-scoring is the 4.8 ha brownfield site at Former Albion Chemical Works, Booth Lane, Moston, Cheshire East, 0.47 km from a substation with 26.6 MVA of demand headroom, at 50 of 100.

Map: 5 sites in Cheshire East, one dot each
All 5 on the map.

Sites ranked by score

All 5 ranked sites in Cheshire East, scored on area, distance to the substation and its demand headroom. How the site score works in the United Kingdom · Filter these sites

#SiteSubstationAreaTo substationDemand headroomGeneration headroomScore
14.8 ha brownfield site at Former Albion Chemical Works, Booth Lane, Moston, Cheshire EastElworth GT1 / Elworth GT2 / Knutsford GT1 / Knutsford GT24.8 ha0.47 km26.6 MVA0.89 MVA50
210 ha brownfield site at Twyfords and Cardway, Alsager, Cheshire EastTwyfords T110 ha0.3 km3.08 MVA8.26 MVA30
32.85 ha brownfield site at LPS 43 Intertechnic Uk Ltd, Road Beta, Middlewich, Cheshire EastMidpoint Pochin Way T12.85 ha0.88 km5.58 MVA10.5 MVA22
41.09 ha brownfield site at Oakwood Nurseries, Chelford Road, Ollerton, Cheshire EastIlfords T1 / Knutsford T1 / Mobberley T1 / Radbroke Hall T11.09 ha2.62 km14.7 MVA0.01 MVA15
59.03 ha brownfield site at Former Manchester Metropolitan University Campus, Alsager, Cheshire EastCoppenhall GT1 / Crewe GT1 / Crewe GT2A / Crewe GT4A / Radway Green GT1 / Radway Green GT2 / Whitchurch GT29.03 ha1.81 km-3.17 MVA157 MVA4

Search links for AI assistants

The sites in Cheshire East as plain links an assistant can open: each answer lists the sites with their facts and page, and links to narrower and wider searches with how many sites each finds.

How to give them to Claude or ChatGPT: the API page.

Owners and grid capacity for these sites.For the 5 sites in Cheshire East: who owns each one, the free capacity at its substation and its planning status, on request.

Not sure which ones fit? A powered-land shortlist picks about 20 sites for your brief in a region you name, with grid capacity, zoning, permits and owners, in 5 working days. See a sample.

Other local authorities

Data on this page