Powered land · United Kingdom

Sites near grid capacity in High Peak

8 candidate sites within 2 km of a primary or bulk supply substation with headroom in High Peak, England, ranked by site score. The highest-scoring is the 84 ha site near Hope substation, High Peak, 0.18 km from a substation with 18.4 MVA of demand headroom, at 69 of 100.

Sites ranked by score

All 7 ranked sites in High Peak, scored on area, distance to the substation and its demand headroom. How the site score works in the United Kingdom · Filter these sites

#SiteSubstationAreaTo substationDemand headroomGeneration headroomScore
184 ha site near Hope substation, High PeakHope84 ha0.18 km18.4 MVA1.69 MW69
276 ha site near Hope substation, High PeakHope76 ha0.46 km18.4 MVA1.69 MW63
365 ha site near Hope substation, High PeakHope65 ha0.86 km18.4 MVA1.69 MW54
41,617 ha site near Hope substation, High PeakHope1,617 ha1.81 km18.4 MVA1.69 MW51
540 ha site near Hope substation, High PeakHope40 ha1.08 km18.4 MVA1.69 MW43
657 ha site near Hope substation, High PeakHope57 ha1.47 km18.4 MVA1.69 MW42
739 ha site near Hope substation, High PeakHope39 ha1.37 km18.4 MVA1.69 MW38

Sites touching a substation

Ranked apart: most of these 1 are the station's own land.

Owners and grid capacity for these sites.For the 8 sites in High Peak: who owns each one, the free capacity at its substation and its planning status, on request.

Request owners and grid capacity

Other local authorities

Data on this page