Brynpica Landfill Site is a power plant in Rhondda Cynon Taf, Wales, United Kingdom, with 2.7 MW of capacity, operated by Novera.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rhondda Cynon Taf (coordinates), Wales | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Brynpica Landfill Site | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2003 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 20 Mar 2003 (permit 03/0026, Town and Country Planning Act, issued by Rhondda Cynon Taf) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Jan 2003 (reference 03/0026, planning authority Rhondda Cynon Taf) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 20 Mar 2003 (granted, reference 03/0026, planning authority Rhondda Cynon Taf) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Novera | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.7 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Landfill Gas | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6584, -3.4807 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Brynpica Landfill Site is the 342nd-largest of 424 power plants in Wales and the 3,877th-largest of 5,050 in the United Kingdom by capacity; its 2.7 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Wales | 342nd of 424 | 9,068 MW | <0.1% |
| United Kingdom | 3,877th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 9,879th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
- Permit issued (Town and Country Planning Act), no. 03/0026
Nearby
Within 50 km of this power plant: 212 grid connections and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ferndale Windfarm grid connection | Grid connection | — | — | 1.7 km |
| Abergorki Wind Farm grid connection | Grid connection | — | — | 3.0 km |
| Rhondda Cynon TAF Maerdy Windfarm grid connection | Grid connection | — | — | 3.0 km |
| Centerprise International (Distribution) | Data center | — | — | 18 km |
| CGI Datacenter | Data center | — | — | 20 km |
| Microsoft Newport data centre | Data center | — | — | 33 km |
Operator and place
More from Novera
- Prysan Wind Farm9.9 MW
- Corston Windfarm7.9 MW
- Arpley Landfill Scheme 'A'7.9 MW
- Arpley Landfill Scheme 'B'7.9 MW
- Mount Boy6 MW
- North Wiltshire Biomass Power Plant5.5 MW
- Enderby Warren Phase II4.9 MW
- Silent Valley Landfill Scheme2.7 MW
Other power plants in Wales
- Dinorwig1,728 MW
- Gwynt y Mor576 MW
- Ffestiniog360 MW
- Port Talbot Renewable Energy Plant350 MW
- Anglesey Biomass Power Station299 MW
- Tidal Lagoon Swansea Bay240 MW
- Pen Y Cymoedd228 MW
- Carnedd Wen Wind Farm150 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.