Data center · Wales, United Kingdom
Microsoft Newport data centre
Microsoft Newport data centre is a data centre in Wales, United Kingdom, with a 166,354 m² site, operated by Microsoft.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wales | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | Imperial Park, Newport, NP10 8FS | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Microsoft | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 166,354 m² (site outline) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.5511, -3.0409 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Microsoft operates 3 of the 191 data centers in the United Kingdom in our data with a named owner; 12 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
Nearby
Within 50 km of this data center: 461 power plants (185 operating, 3,880 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wentlooge Renewable Energy Hub | Power plant | 125 MW | Planned | 2.1 km |
| Docksway Landfill Scheme | Power plant | 2 MW | Operating | 3.0 km |
| Docks Way Solar Farm | Power plant | 2.37 MW | Permitted | 3.1 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 27 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 30 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 40 km |
Operator and place
More from Microsoft
- Microsoft Fairwater Atlanta636 MW
- Microsoft Fairwater Wisconsin369 MW
- Microsoft Goodyear202 MW
- Microsoft Project Osmium190 MW
- Microsoft SAT4075 MW
- Nebius Mantsala75 MW
- Microsoft-Nebius New Jersey50 MW
- Microsoft SAT1447 MW
Other data centers in Wales
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.