Power plant · Warrington, England, United Kingdom

Arpley Landfill Scheme 'A'

Arpley Landfill Scheme 'A' is a biomass power plant in Warrington, England, United Kingdom, with 7.9 MW of capacity, operated by Novera.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWarrington (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressOff Liverpool Road Sankey Bridges CheshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1999DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date24 Feb 1995 (Town and Country Planning Act, issued by Warrington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Aug 1994 (planning authority Warrington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Feb 1995 (granted, planning authority Warrington)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNoveraDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.3727, -2.6405DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Warrington)
  3. Permit applied for (planning authority Warrington)

How it compares

Arpley Landfill Scheme 'A' is the 1,802nd-largest of 4,035 power plants in England and the 2,776th-largest of 5,834 in the United Kingdom by capacity; its 7.9 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,802nd of 4,035134,434 MW<0.1%
United Kingdom2,776th of 5,834200,500 MW<0.1%
All power plants in our data11,213th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 314 grid connections (175 operating, 1,564 MW), 312 substations, 18 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Iron MountainData center——4.7 km
Verizon WarringtonData center——5.9 km
Bold GSPSubstation——7.7 km
The Babbage CentreData center——8.3 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned8.4 km
Parkside Railway Station grid connectionGrid connection3 MWOperating8.7 km
Newton Le WillowsSubstation——9.7 km
Lymes Wood Landfill Site grid connectionGrid connection1.03 MWOperating10 km
RisleySubstation——10 km