Power plant · Blaby, England, United Kingdom

Enderby Warren Phase II

Enderby Warren Phase II is a power plant in Blaby, England, United Kingdom, with 4.9 MW of capacity, operated by Novera.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBlaby (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMill Hill, Enderby Warren,DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1999DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Nov 1997 (permit 1997/0785/1, Town and Country Planning Act, issued by Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 Jul 1997 (reference 1997/0785/1, planning authority Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Nov 1997 (granted, reference 1997/0785/1, planning authority Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNoveraDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5976, -1.2071DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Enderby Warren Phase II is the 2,193rd-largest of 3,430 power plants in England and the 3,273rd-largest of 5,050 in the United Kingdom by capacity; its 4.9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,193rd of 3,43071,985 MW<0.1%
United Kingdom3,273rd of 5,050115,642 MW<0.1%
All power plants in our data8,918th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 1997/0785/1
  2. Started operating

Nearby

Within 50 km of this power plant: 370 grid connections, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Next Enderby grid connectionGrid connection——0.9 km
Desford Road BESS grid connectionGrid connection——1.0 km
Santander data center, EnglandData center——1.6 km
Santander data center, EnglandData center——2.1 km
Greens Lodge Farm, Huncote Engine No 2 grid connectionGrid connection——2.6 km
Data center, England (OSM way 710050084)Data center——13 km
Weston Marsh to East LeicestershireTransmission line—Planned28 km

Operator and place

More from Novera

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page