Power plant · Renfrewshire, Scotland, United Kingdom
Locher Works, Kilbarchan Road - Solar Photovoltaic Array
Locher Works, Kilbarchan Road - Solar Photovoltaic Array is a permitted power plant in Renfrewshire, Scotland, United Kingdom, with 3 MW of capacity, operated by Bluestone Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Renfrewshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Locher Works, Kilbarchan Road, Bridge of Weir, PA11 3RL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 5 Sept 2024 (permit 24/0139/PP, Town and Country Planning Act, issued by Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 6 Mar 2024 (reference 24/0139/PP, planning authority Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 5 Sept 2024 (granted, reference 24/0139/PP, planning authority Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Bluestone Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 4.52 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.8491, -4.5639 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Locher Works, Kilbarchan Road - Solar Photovoltaic Array is the 792nd-largest of 872 power plants planned, permitted or under construction in Scotland and the 2,687th-largest of 3,222 in the United Kingdom by capacity; its 3 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 792nd of 872 | 99,272 MW | <0.1% |
| United Kingdom | 2,687th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,853rd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 25 substations, 16 grid connections (9 operating, 223 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Strathleven GSP | Substation | — | — | 12 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 16 km |
| Auchincarroch (GEN464G2) grid connection | Grid connection | 1.01 MW | Operating | 16 km |
| iomart Glasgow Data Centre | Data center | — | — | 17 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 18 km |
| DataVita DV2 | Data center | — | — | 19 km |
| Blairlinnans Primary | Substation | — | — | 20 km |
| Dumfin 11kV Network | Substation | — | — | 21 km |
| Ross Priory Hydro grid connection | Grid connection | 4 MW | Planned | 23 km |
Operator and place
More from Bluestone Energy
- Barnett Wood Lane - Battery Storage98 MW · permitted
- Coventry National Grid Substation, Hawkesbury Hall - Battery Storage98 MW · planned
- Middleton Road - Linwood Battery Energy Storage System69 MW
- Pilton Village, Luffenham Lane - Staveley Solar Array49.9 MW · permitted
- Laigh Park Water Treatment Works - Battery Energy Storage System49.5 MW · planned
- Malcolmwood Farm, Loanend Road - Battery Energy Storage System49.5 MW · planned
- Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage49 MW · permitted
- Locks Street, Coatdyke - Battery Energy Storage Systems45 MW · planned
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.