Power plant · West Suffolk, England, United Kingdom
Wales End Road, Cavendish - Battery Energy Storage System
Wales End Road, Cavendish - Battery Energy Storage System is a planned battery storage plant in West Suffolk, England, United Kingdom, with 10 MW of capacity, operated by Noventum Power Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | West Suffolk (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | N/O Wales End Road, Cavendish, Sudbury, CO10 8DE | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Jul 2025 (reference DC/25/1027/FUL, planning authority West Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Noventum Power Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.1118, 0.6252 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority West Suffolk, reference DC/25/1027/FUL)
How it compares
Wales End Road, Cavendish - Battery Energy Storage System is the 1,156th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,857th-largest of 2,548 in the United Kingdom by capacity; its 10 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,156th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 1,857th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,945th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 3 data centers and 1 transmission line, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bramford to Twinstead | Transmission line | — | Permitted | 20 km |
| US Air Force data center, Brandon | Data center | — | — | 32 km |
| Redcentric Cambridge | Data center | — | — | 35 km |
| West Cambridge Data Centre | Data center | — | — | 39 km |
Operator and place
More from Noventum Power Limited
- Arleston Solar & Battery Energy Storage System99.9 MW · planned
- Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array50 MW · planned
- Hillam Grange, Austfield Lane - Solar Farm49.9 MW · permitted
- Longbreach Solar Farm49.9 MW · planned
- Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array49.9 MW · planned
- Arleston Solar & Battery Energy Storage System43 MW · planned
- High Rigg Solar Farm - Solar Panels30 MW
- Turners Lane, Barnacre - Solar Farm23 MW · permitted
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.