Power plant · South Derbyshire, England, United Kingdom

Arleston Solar & Battery Energy Storage System

Arleston Solar & Battery Energy Storage System is a planned power plant in South Derbyshire, England, United Kingdom, with 99.9 MW of capacity, operated by Noventum Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Derbyshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressManor Farm, Arleston Lane, Arleston, Derby, DE73 7HNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Jul 2025 (reference DMOT/2025/0113, planning authority South Derbyshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNoventum Power LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity99.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8641, -1.4976DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Arleston Solar & Battery Energy Storage System is the 296th-largest of 2,174 power plants planned, permitted or under construction in England and the 501st-largest of 3,222 in the United Kingdom by capacity; its 99.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England296th of 2,174186,088 MW<0.1%
United Kingdom501st of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,415th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 412 grid connections, 5 data centers, 2 transmission lines and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Arleston Solar Farm grid connectionGrid connection——0.2 km
Landown Farm grid connectionGrid connection——3.1 km
Derby and Derbyshire New Waste (NWFT) grid connectionGrid connection——3.6 km
Chesterfield to WillingtonTransmission line—Planned19 km
ExperianData center——24 km
nLighten NottinghamData center——25 km
Santander data center, EnglandData center——37 km
Weston Marsh to East LeicestershireTransmission line—Planned37 km
DronfieldSubstation——49 km

Operator and place

More from Noventum Power Limited

Other power plants in England

All 5809 power plants in England, United Kingdom