Power plant · South Derbyshire, England, United Kingdom
Arleston Solar & Battery Energy Storage System
Arleston Solar & Battery Energy Storage System is a planned power plant in South Derbyshire, England, United Kingdom, with 99.9 MW of capacity, operated by Noventum Power Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Derbyshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Manor Farm, Arleston Lane, Arleston, Derby, DE73 7HN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 2 Jul 2025 (reference DMOT/2025/0113, planning authority South Derbyshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Noventum Power Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 99.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.8641, -1.4976 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Arleston Solar & Battery Energy Storage System is the 296th-largest of 2,174 power plants planned, permitted or under construction in England and the 501st-largest of 3,222 in the United Kingdom by capacity; its 99.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 296th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 501st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,415th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 412 grid connections, 5 data centers, 2 transmission lines and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Arleston Solar Farm grid connection | Grid connection | — | — | 0.2 km |
| Landown Farm grid connection | Grid connection | — | — | 3.1 km |
| Derby and Derbyshire New Waste (NWFT) grid connection | Grid connection | — | — | 3.6 km |
| Chesterfield to Willington | Transmission line | — | Planned | 19 km |
| Experian | Data center | — | — | 24 km |
| nLighten Nottingham | Data center | — | — | 25 km |
| Santander data center, England | Data center | — | — | 37 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 37 km |
| Dronfield | Substation | — | — | 49 km |
Operator and place
More from Noventum Power Limited
- Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array50 MW · planned
- Hillam Grange, Austfield Lane - Solar Farm49.9 MW · permitted
- Longbreach Solar Farm49.9 MW · planned
- Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array49.9 MW · planned
- Arleston Solar & Battery Energy Storage System43 MW · planned
- High Rigg Solar Farm - Solar Panels30 MW
- Turners Lane, Barnacre - Solar Farm23 MW · permitted
- Hatherton Lodge Farm, Hunsterson Road - Solar Farm12.5 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.