Grid connection · England, United Kingdom
(ANM) Wales End Farm grid connection
(ANM) Wales End Farm grid connection is a planned grid connection in England, United Kingdom, with 12.5 MW of capacity, held by Noventum Power Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Belchamp Grid 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Noventum Power Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Wales End Road, Cavendish - Solar Farm (matched by shared name+coordinates+technology+capacity+company, 0.56 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 12.5 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 10 Jun 2023 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 31 Oct 2034 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.1165, 0.6220 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Permit applied for: Wales End Road, Cavendish - Solar Farm (planning authority West Suffolk, reference DC/25/1027/FUL)
How it compares
(ANM) Wales End Farm grid connection is the 1,697th-largest of 3,539 grid connections in England and the 2,410th-largest of 4,870 in the United Kingdom by capacity; its 12.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,697th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 2,410th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 5,991st of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 277 power plants (110 operating, 1,695 MW), 143 substations, 3 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wales End Road, Cavendish - Battery Energy Storage System | Power plant | 10 MW | Planned | 0.6 km |
| Wales End Road, Cavendish - Solar Farm | Power plant | 12.5 MW | Planned | 0.6 km |
| Glemsford Primary 11kV | Substation | — | — | 5.1 km |
| Claredown Farm | Power plant | 20 MW | Operating | 5.1 km |
| Belchamp Grid 11kV | Substation | — | — | 5.3 km |
| Belchamp Grid 33kV | Substation | — | — | 5.3 km |
| Bramford to Twinstead | Transmission line | — | Permitted | 20 km |
| US Air Force data center, Brandon | Data center | — | — | 32 km |
| Redcentric Cambridge | Data center | — | — | 35 km |
Holder, grid operator and place
More from Noventum Power Limited
- Halsalls Lodge grid connection119 MW
- Moss Nook grid connection100 MW
- Newtown Farm grid connection100 MW
- Inglewood Solar Farm grid connection30 MW
- Hatherton Lodge Farm grid connection12 MW
- Dukinfield Farm grid connection10 MW
- Roanhead Solar Farm grid connection10 MW
- Arleston Solar & Battery Energy Storage System99.9 MW · planned
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.