Power plant · South Derbyshire, England, United Kingdom

Arleston Solar & Battery Energy Storage System

Arleston Solar & Battery Energy Storage System is a planned power plant in South Derbyshire, England, United Kingdom, with 43 MW of capacity, operated by Noventum Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Derbyshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressManor Farm, Arleston Lane, Arleston, Derby, DE73 7HNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Jul 2025 (reference DMOT/2025/0113, planning authority South Derbyshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNoventum Power LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity43 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area48.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8641, -1.4976DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority South Derbyshire, reference DMOT/2025/0113)

How it compares

Arleston Solar & Battery Energy Storage System is the 822nd-largest of 2,174 power plants planned, permitted or under construction in England and the 1,315th-largest of 3,222 in the United Kingdom by capacity; its 43 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England822nd of 2,174185,888 MW<0.1%
United Kingdom1,315th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,478th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 5 data centers, 2 transmission lines and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned19 km
ExperianData center——24 km
nLighten NottinghamData center——25 km
Santander data center, EnglandData center——37 km
Weston Marsh to East LeicestershireTransmission line—Planned37 km
DronfieldSubstation——49 km

Operator and place

More from Noventum Power Limited

Other power plants in England

All 5809 power plants in England, United Kingdom