Power plant · Westmorland and Furness, England, United Kingdom

High Rigg Solar Farm - Solar Panels

High Rigg Solar Farm - Solar Panels is a cancelled solar power plant in Westmorland and Furness, England, United Kingdom, with 30 MW of capacity, operated by Noventum Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWestmorland and Furness (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressDevonshire Square, Calthwaite, Penrith, CA11 9QEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Jul 2025 (reference 2025/1267/FPA, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Mar 2026 (refused, reference 2025/1267/FPA, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNoventum Power Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area48.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.7483, -2.8763DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Westmorland and Furness, reference 2025/1267/FPA)
  2. Permit applied for (planning authority Westmorland and Furness, reference 2025/1267/FPA)

How it compares

High Rigg Solar Farm - Solar Panels is the 649th-largest of 4,035 power plants in England and the 1,074th-largest of 5,834 in the United Kingdom by capacity; its 30 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England649th of 4,035134,434 MW<0.1%
United Kingdom1,074th of 5,834200,500 MW<0.1%
All power plants in our data5,216th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 100 grid connections (49 operating, 490 MW), 52 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Inglewood Solar Farm grid connectionGrid connection30 MWPlanned0.0 km
Skelton CSubstation——1.4 km
Hutton EndSubstation——2.4 km
Low Dyke grid connectionGrid connection6 MWPlanned2.7 km
Low Dyke grid connectionGrid connection6 MWPlanned2.7 km
SeberghamSubstation——8.7 km
Cross Border Connection (England)Transmission line—Planned44 km

Operator and place

Grid connections attached to this power plant

More from Noventum Power Limited

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page