Power plant · Doncaster, England, United Kingdom

Tween Bridge Solar Farm

Tween Bridge Solar Farm is a planned power plant in Doncaster, England, United Kingdom made up of 2 power plants with 1,200 MW of capacity between them, operated by RWE Renewables UK Solar and Storage Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDoncaster (coordinates), England (Yorkshire and the Humber)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
LocationEnglandNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
AddressLand either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby CanalPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (recommendation)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Aug 2025 (reference EN010148, planning authority The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRWE Renewables UK Solar and Storage Limited (applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area1,823 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.6084, -0.9233Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit applied for: The Tween Bridge Solar Farm (planning authority The Planning Inspectorate - National Infrastructure, reference EN010148)
  2. Permit applied for: The Tween Bridge Solar Farm (planning authority The Planning Inspectorate - National Infrastructure, reference EN010148)
  3. Permit applied for (planning authority The Planning Inspectorate, reference EN010148) · source

Also recorded as

2 sources record Tween Bridge Solar Farm; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
Tween Bridge Solar Farmasset:pins-nsip:en010148Planning Inspectorate: National Infrastructure Projects—
Tween Bridge Solar Parkasset:neso-tec:pro-001990NESO TEC RegisterSame name, technology and company

How it compares by area

Tween Bridge Solar Farm is the 40th-largest of 2,300 power plants in England and the 44th-largest of 2,673 in the United Kingdom by area, with 1,823 ha. It reports no capacity, so it is ranked by area among the power plants in our data that report one, whatever their status. Areas of shared titles overlap, so they are not added up.

WithinRank
England40th of 2,300
United Kingdom44th of 2,673
All power plants in our data64th of 2,695

How its operator compares

RWE Renewables UK Solar and Storage Limited operates 6 of the 8,060 power plants in the United Kingdom in our data with a named owner; 220 owners have more. Counts cover the power plants in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankPower plantsShare
Lightsource Renewable Energy1st1582%
Anesco2nd921.1%
Scottish and Southern Energy3rd831%
Renewable Energy Systems4th740.92%
British Solar Renewables5th620.77%
RWE Renewables UK Solar and Storage Limited221st6<0.1%

Nearby

Within 50 km of this power plant: 450 grid connections (227 operating, 2,770 MW), 315 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gas 1.5 MW grid connection at ThorneGrid connection1.5 MWOperating1.8 km
Wind 44 MW grid connection at Tween Bridge WindfarmGrid connection44 MWOperating2.8 km
ThorneSubstation——2.9 km
Solar 3.5 MW grid connection at ThorneGrid connection3.5 MWOperating3.9 km
CrowleSubstation——6.4 km
StainforthSubstation——6.5 km
ThalesData center——17 km
North Humber to High MarnhamTransmission line—Planned17 km
HSBC Wakefield Data CentreData center——32 km

Operator and place

How its power plants compare

The 2 power plants in this power plant, with their share of its 1,200 MW of capacity.

Power plantLocationOwnerStatusCapacityShare
The Tween Bridge Solar FarmDoncaster, England, United Kingdom—Planned800 MW67%
The Tween Bridge Solar FarmDoncaster, England, United Kingdom—Planned400 MW33%

Grid connections attached to this power plant

More from RWE Renewables UK Solar and Storage Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page