Power plant · Doncaster, England, United Kingdom

The Tween Bridge Solar Farm

The Tween Bridge Solar Farm is a planned power plant in Doncaster, England, United Kingdom, with 800 MW of capacity, operated by RWE.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDoncaster (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMoor Owners Rd, Thorne, Doncaster, DN8 5RXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Part ofTween Bridge Solar Farm (matched by planning reference)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Application date26 Aug 2025 (reference EN010148, planning authority The Planning Inspectorate - National Infrastructure)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRWEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity800 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area1,831 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.6216, -0.9334DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority The Planning Inspectorate - National Infrastructure, reference EN010148)
  2. Permit applied for: Tween Bridge Solar Farm (planning authority The Planning Inspectorate, reference EN010148) · source

How it compares

The Tween Bridge Solar Farm is the 47th-largest of 2,174 power plants planned, permitted or under construction in England and the 75th-largest of 3,222 in the United Kingdom by capacity; its 800 MW is 0.27% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England47th of 2,174185,888 MW0.43%
United Kingdom75th of 3,222300,461 MW0.27%
All power plants planned, permitted or under construction in our data134th of 6,455664,040 MW0.12%

Nearby

Within 50 km of this power plant: 448 grid connections (228 operating, 2,820 MW), 317 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gas 1.5 MW grid connection at ThorneGrid connection1.5 MWOperating1.1 km
ThorneSubstation——1.3 km
Wind 44 MW grid connection at Tween Bridge WindfarmGrid connection44 MWOperating1.7 km
Solar 3.5 MW grid connection at ThorneGrid connection3.5 MWOperating2.3 km
StainforthSubstation——6.4 km
RawcliffeSubstation——6.8 km
ThalesData center——18 km
North Humber to High MarnhamTransmission line—Planned19 km
HSBC Wakefield Data CentreData center——31 km

Operator and place

More from RWE

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page