Grid connection · England, United Kingdom
Tween Bridge Solar Park grid connection
Tween Bridge Solar Park grid connection is a planned grid connection in England, United Kingdom, with 800 MW of capacity, held by RWE Renewables UK Solar and Storage Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Trent Valley North Connection Node B 400kV Substation) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (scoping) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Holder | RWE Renewables UK Solar and Storage Limited | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Tween Bridge Solar Park | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 800 MW | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Energy Storage System | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | PV Array (Photo Voltaic/solar) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | National Grid Electricity Transmission plc | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Nov 2032 (stage 2, cumulative 590 MW) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Oct 2029 (stage 1, cumulative 340 MW) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Oct 2037 (stage 3, cumulative 800 MW) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Tween Bridge Solar Park grid connection is the 173rd-largest of 2,533 grid connections in England and the 243rd-largest of 3,903 in the United Kingdom by capacity; its 800 MW is 0.18% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 173rd of 2,533 | 319,370 MW | 0.25% |
| United Kingdom | 243rd of 3,903 | 446,745 MW | 0.18% |
| All grid connections in our data | 409th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Stage 1 due to connect, 340 MW in total
- Stage 2 due to connect, 590 MW in total
- Stage 3 due to connect, 800 MW in total
Holder, grid operator and place
More from RWE Renewables UK Solar and Storage Limited
- J212 High Grove Solar grid connection720 MW
- Great Oak Solar grid connection700 MW
- J217 Cumbrian Ring grid connection99.9 MW
- High Grove Solar720 MW · planned
- Peartree Hill Solar Farm320 MW · permitted
- Byers Gill Solar180 MW · permitted
- Eden Meadows, Stretton Road, Morton - Solar PV Panels & Battery Energy Storage System49.9 MW
- Cotmoor Lane49.9 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.