Power plant · County Durham, England, United Kingdom
Sheraton Hall Solar Farm
Sheraton Hall Solar Farm is a permitted power plant in County Durham, England, United Kingdom, with 49.9 MW of capacity, operated by Lightsource BP.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | County Durham (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Sheraton Hall Farm, TS27 4RD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (appeal granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 6 Dec 2023 (permit DM/20/03722/FPA, Town and Country Planning Act, issued by County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 18 Dec 2020 (reference DM/20/03722/FPA, planning authority County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 10 Dec 2021 (refused, reference DM/20/03722/FPA, planning authority County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Dec 2023 (appeal granted, reference DM/20/03722/FPA, planning authority County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Dec 2023 (granted, reference DM/20/03722/FPA, planning authority County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lightsource BP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 77.4 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.7052, -1.3295 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Sheraton Hall Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 514th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 277 grid connections (139 operating, 1,346 MW), 161 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar 42 MW grid connection at Sheraton Solar | Grid connection | 42 MW | Planned | 0.9 km |
| Whelley Hill Farm Charging 2 grid connection | Grid connection | 12 MW | Planned | 2.0 km |
| Whelley Hill Farm grid connection | Grid connection | 50 MW | Planned | 2.0 km |
| Hartmoor | Substation | — | — | 2.5 km |
| Hartmoor 66/20kV | Substation | — | — | 2.5 km |
| Peterlee West | Substation | — | — | 6.4 km |
| DXC Wynyard Data Center | Data center | — | — | 8.1 km |
| Lumen Technologies data center, Middlesbrough | Data center | — | — | 15 km |
| Pulsant data center, England | Data center | — | — | 17 km |
Operator and place
More from Lightsource BP
- Hurst Farm, Mansfield Road - Battery Energy Storage System99.9 MW · permitted
- Pentir Substation, Pentir - Battery Energy Storage57 MW · permitted
- Plas Power Estate Solar Farm57 MW · planned
- Plas Power Estate Solar Farm57 MW · planned
- Edge Lane, Maiden Law - Solar Farm & Battery Storage49.9 MW · permitted
- The Grange49.9 MW
- South Lowfields Farm49.9 MW · permitted
- Edge Lane, Maiden Law - Solar Farm & Battery Storage45 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.