Power plant · Bolsover, England, United Kingdom
Hurst Farm, Mansfield Road - Battery Energy Storage System
Hurst Farm, Mansfield Road - Battery Energy Storage System is a permitted power plant in Bolsover, England, United Kingdom, with 99.9 MW of capacity, operated by Lightsource BP.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bolsover (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Hurst Farm Mansfield Road Tibshelf, DE55 5NG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 19 Dec 2025 (permit 25/00302/FUL, Town and Country Planning Act, issued by Bolsover) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Jul 2025 (reference 25/00302/FUL, planning authority Bolsover) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 Dec 2025 (granted, reference 25/00302/FUL, planning authority Bolsover) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lightsource BP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 99.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1470, -1.3252 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Hurst Farm, Mansfield Road - Battery Energy Storage System is the 296th-largest of 2,174 power plants planned, permitted or under construction in England and the 501st-largest of 3,222 in the United Kingdom by capacity; its 99.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 296th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 501st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,415th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 427 grid connections (71 operating, 679 MW), 126 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Huthwaite Whiteborough Solar Park Chesterfield Road grid connection | Grid connection | — | — | 1.0 km |
| UKI262 Oilwell grid connection | Grid connection | — | — | 1.2 km |
| Tibshelf Huthwaite Solar Farm Twinyards Farm Back Lane grid connection | Grid connection | — | — | 2.7 km |
| Chesterfield to Willington | Transmission line | — | Planned | 15 km |
| nLighten Nottingham | Data center | — | — | 17 km |
| Dronfield | Substation | — | — | 19 km |
| Kiveton Park | Substation | — | — | 21 km |
| Jordanthorpe | Substation | — | — | 22 km |
| Hive IT | Data center | — | — | 27 km |
Operator and place
More from Lightsource BP
- Pentir Substation, Pentir - Battery Energy Storage57 MW · permitted
- Plas Power Estate Solar Farm57 MW · planned
- Plas Power Estate Solar Farm57 MW · planned
- Edge Lane, Maiden Law - Solar Farm & Battery Storage49.9 MW · permitted
- The Grange49.9 MW
- South Lowfields Farm49.9 MW · permitted
- Sheraton Hall Solar Farm49.9 MW · permitted
- Edge Lane, Maiden Law - Solar Farm & Battery Storage45 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.