The Grange is a power plant in Newark and Sherwood, England, United Kingdom, with 49.9 MW of capacity, operated by Lightsource BP.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Newark and Sherwood (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | The Grange, Cotham Lane, Hawton, Newark, Nottinghamshire, NG24 3RJ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2021 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 28 Jun 2023 (permit 19/01408/FULM, Town and Country Planning Act, issued by Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Aug 2019 (reference 19/01408/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Jun 2023 (granted, reference 19/01408/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lightsource BP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.0513, -0.8209 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
The Grange is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 175th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 362nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 1,841st of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
- Permit issued (Town and Country Planning Act), no. 19/01408/FULM
Nearby
Within 50 km of this power plant: 340 grid connections (18 operating, 176 MW), 16 substations, 4 transmission lines and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Newark Energy Storage Plant grid connection | Grid connection | — | — | 1.2 km |
| Sovereign Property Partners LLP Stor Site grid connection | Grid connection | — | — | 1.3 km |
| Newark Power Generation Plant, Bowbridge Lane, Balderton, Newark grid connection | Grid connection | — | — | 1.4 km |
| Digital Space DC - Newark | Data center | — | — | 3.6 km |
| nLighten Nottingham | Data center | — | — | 27 km |
| Experian | Data center | — | — | 29 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 30 km |
| Stow | Substation | — | — | 31 km |
| Lea Road | Substation | — | — | 38 km |
Operator and place
More from Lightsource BP
- Hurst Farm, Mansfield Road - Battery Energy Storage System99.9 MW · permitted
- Pentir Substation, Pentir - Battery Energy Storage57 MW · permitted
- Plas Power Estate Solar Farm57 MW · planned
- Plas Power Estate Solar Farm57 MW · planned
- Edge Lane, Maiden Law - Solar Farm & Battery Storage49.9 MW · permitted
- South Lowfields Farm49.9 MW · permitted
- Sheraton Hall Solar Farm49.9 MW · permitted
- Edge Lane, Maiden Law - Solar Farm & Battery Storage45 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.