Grid connection · England, United Kingdom
((ANM) Stow Road grid connection
((ANM) Stow Road grid connection is a planned grid connection in England, United Kingdom, with 6 MW of capacity, held by Anglo Renewables Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Kimbolton Primary 11kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Anglo Renewables Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Kimbolton Primary 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 6 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 14 Feb 2021 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 31 Oct 2028 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.3097, -0.3854 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
((ANM) Stow Road grid connection is the 2,165th-largest of 3,539 grid connections in England and the 3,023rd-largest of 4,870 in the United Kingdom by capacity; its 6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,165th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 3,023rd of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,701st of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 465 power plants (180 operating, 2,917 MW), 109 substations and 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bicton Industrial Park, Stow Road - Solar Farm | Power plant | 8 MW | Permitted | 0.2 km |
| Kimbolton Primary 11kV | Substation | — | — | 0.8 km |
| Bicton Wind Farm | Power plant | 9 MW | Cancelled | 1.1 km |
| Rookery Farm Solar Farm | Power plant | 5.3 MW | Operating | 1.1 km |
| Perry Primary 11kV | Substation | — | — | 6.2 km |
| Brington Primary 11kV | Substation | — | — | 6.7 km |
| Data center, England (OSM way 87850427) | Data center | — | — | 29 km |
| The Horizon Centre | Data center | — | — | 29 km |
| West Cambridge Data Centre | Data center | — | — | 34 km |
Holder, grid operator and place
More from Anglo Renewables Limited
- (ANM) Barleylands Road grid connection49.9 MW
- Kingsclere Solar Farm grid connection23 MW
- (ANM) Crows Lane grid connection20 MW
- Grange Farm grid connection20 MW
- Penstone Lane, Penn 1 - Battery Storage Facility50 MW
- Penstone Lane, Lower Penn 2 - Battery Storage50 MW
- Says Court Farm, Coalpit Heath - Battery Energy Storage50 MW
- Levedale Road, Levedale - Battery Energy Storage50 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.