Power plant · North Yorkshire, England, United Kingdom
Leeming Bar (Waste AD)
Leeming Bar (Waste AD) is a power plant in North Yorkshire, England, United Kingdom, with 1.5 MW of capacity, operated by JFS Biogas.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Yorkshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land to rear of Clapham Lodge, Dere Street, Leeming, Northallerton, DL7 9LY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 2 Apr 2015 (permit NY/2013/0237/FUL, Town and Country Planning Act, issued by North Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 30 Jul 2013 (ref. NY/2013/0237/FUL, North Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 2 Apr 2015 (granted, ref. NY/2013/0237/FUL, North Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | JFS Biogas | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.2922, -1.5393 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Leeming Bar (Waste AD) is the 3,048th-largest of 3,430 power plants in England and the 4,531st-largest of 5,050 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,048th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,531st of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 11,060th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. NY/2013/0237/FUL
- Started operating
Nearby
Within 50 km of this power plant: 200 grid connections (98 operating, 1,138 MW), 117 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Waste 1.425 MW grid connection at Bedale | Grid connection | 1.43 MW | Operating | 0.1 km |
| Gas 12.5 MW grid connection at Leeming RAF | Grid connection | 12.5 MW | Operating | 2.1 km |
| Gas 4 MW grid connection at Bedale | Grid connection | 4 MW | Operating | 2.2 km |
| Bedale | Substation | — | — | 3.3 km |
| Leeming Bar/Skeeby | Substation | — | — | 4.1 km |
| Romanby | Substation | — | — | 6.8 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 47 km |
Operator and place
More from JFS Biogas
- Park Shield1 MW
- Church Farm AD1 MW
- Gravel Pit Farm1 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.