Power plant · Somerset, England, United Kingdom

Ham Farm, Creech St Michael - Solar Array

Ham Farm, Creech St Michael - Solar Array is a permitted power plant in Somerset, England, United Kingdom, with 20 MW of capacity, operated by Novus Renewable Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHam Farm, Ham, Creech St Michael., TA3 5NYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 Jun 2024 (permit 14/22/0051, Town and Country Planning Act, issued by Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Nov 2022 (reference 14/22/0051, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Jun 2024 (granted, reference 14/22/0051, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNovus Renewable Services LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.0206, -3.0180DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Ham Farm, Creech St Michael - Solar Array is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174186,088 MW<0.1%
United Kingdom1,875th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 265 grid connections (22 operating, 184 MW), 22 substations, 2 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ham Farm grid connectionGrid connection——0.2 km
Land at Brickyard Farm, Creech Solar Farm grid connectionGrid connection——1.2 km
North Curry, Higher Knapp Farm grid connectionGrid connection——1.6 km
Tata Communications Highbridge DatacentreData center——23 km
Larkhill PrimarySubstation——26 km
Axminster GSPSubstation——27 km
West Hendford PrimarySubstation——28 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned38 km
Insight Data LtdData center——38 km

Operator and place

More from Novus Renewable Services Limited

Other power plants in England

All 5809 power plants in England, United Kingdom