Grid connection · England, United Kingdom

Bunford Park Development grid connection

Bunford Park Development grid connection is a planned grid connection in England, United Kingdom, with 6.17 MW of capacity, held by Gridserve EMEA DEPC Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBUNFORD PARK DEVELOPMENT grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at West Hendford)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderGridserve EMEA DEPC LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toWest Hendford Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity6.17 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date31 Mar 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date21 Jun 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.9355, -2.6676SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Bunford Park Development grid connection is the 1,561st-largest of 2,533 grid connections in England and the 2,448th-largest of 3,903 in the United Kingdom by capacity; its 6.17 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,561st of 2,533319,370 MW<0.1%
United Kingdom2,448th of 3,903446,745 MW<0.1%
All grid connections in our data6,393rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 316 power plants (145 operating, 869 MW), 54 substations, 2 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Camp Road, West Coker - Solar PV PanelsPower plant15.2 MWPermitted1.5 km
Larkhill PrimarySubstation——1.7 km
West Hendford PrimarySubstation——1.8 km
Yeovil BSPSubstation——4.7 km
Clifton FarmPower plant35 MWOperating5.8 km
Caswell Farm Solar ParkPower plant6.7 MWOperating7.4 km
Tata Communications Highbridge DatacentreData center——38 km
Hinkley Point C ConnectionTransmission line—Permitted45 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned47 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page