Power plant · Buckinghamshire, England, United Kingdom

Oaks Farm - Solar Farm

Oaks Farm - Solar Farm is a permitted solar power plant in Buckinghamshire, England, United Kingdom, with 37 MW of capacity, operated by Novus Renewable Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBuckinghamshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressOaks Farm, Milton Keynes, MK17 0NFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 May 2026 (permit 25/02284/APP, Town and Country Planning Act, issued by Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jul 2025 (reference 25/02284/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 May 2026 (granted, reference 25/02284/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNovus Renewable Services Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity37 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0205, -0.8454DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Buckinghamshire, reference 25/02284/APP)
  2. Permit applied for (planning authority Buckinghamshire, reference 25/02284/APP)

How it compares

Oaks Farm - Solar Farm is the 754th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,232nd-largest of 2,548 in the United Kingdom by capacity; its 37 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England754th of 1,650171,264 MW<0.1%
United Kingdom1,232nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data2,493rd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 64 grid connections (25 operating, 219 MW), 55 substations and 14 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten Milton KeynesData center——3.0 km
Data center, England (OSM way 460010263)Data center——7.1 km
Pulsant Milton Keynes SE-1Data center——7.3 km
East Claydon GSPSubstation——11 km
Pembridge Farm grid connectionGrid connection131 MWPlanned18 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating20 km
Launton - Battery grid connectionGrid connection40 MWPlanned20 km
Cottisford PrimarySubstation——21 km
Bicester North BSPSubstation——23 km

Operator and place

More from Novus Renewable Services Limited

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page