Power plant · Hinckley and Bosworth, England, United Kingdom

Hall Farm Solar Farm (Newbold Verdon)

Hall Farm Solar Farm (Newbold Verdon) is a solar power plant in Hinckley and Bosworth, England, United Kingdom, with 5 MW of capacity, operated by NextEnergy Solar Fund and Push Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHinckley and Bosworth (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHall Farm, Main Street, Newbold Verdon, LEICESTER, LE9 9NLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Jun 2015 (permit 14/00660/FUL, Town and Country Planning Act, issued by Hinckley and Bosworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jul 2014 (reference 14/00660/FUL, planning authority Hinckley and Bosworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Jun 2015 (granted, reference 14/00660/FUL, planning authority Hinckley and Bosworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNextEnergy Solar Fund (Push Energy/ NextEnergy Solar Fund (NESF))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPush Energy (Push Energy/ NextEnergy Solar Fund (NESF))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area20.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6310, -1.3451DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Hinckley and Bosworth, reference 14/00660/FUL)
  3. Permit applied for (planning authority Hinckley and Bosworth, reference 14/00660/FUL)

How it compares

Hall Farm Solar Farm (Newbold Verdon) is the 999th-largest of 2,105 power plants in England and the 1,474th-largest of 2,942 in the United Kingdom by capacity; its 5 MW is <0.1% of the 105,383 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England999th of 2,10572,593 MW<0.1%
United Kingdom1,474th of 2,942105,383 MW<0.1%
All power plants in our data9,594th of 12,2301,691,896 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 710050084)Data center——10 km
Santander data center, EnglandData center——11 km
Santander data center, EnglandData center——11 km
Weston Marsh to East LeicestershireTransmission line—Planned32 km
Chesterfield to WillingtonTransmission line—Planned45 km