Power plant · Colchester, England, United Kingdom

Langenhoe Solar Farm

Langenhoe Solar Farm is a solar power plant in Colchester, England, United Kingdom, with 21.3 MW of capacity, operated by NextEnergy Solar Fund.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationColchester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLangenhoe Hall, Langenhoe, ColchesterDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Aug 2014 (permit 132330, Town and Country Planning Act, issued by Colchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Nov 2013 (reference 132330, planning authority Colchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Aug 2014 (granted, reference 132330, planning authority Colchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNextEnergy Solar FundDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity21.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8145, 0.9403DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Colchester, reference 132330)
  3. Permit applied for (planning authority Colchester, reference 132330)

How it compares

Langenhoe Solar Farm is the 850th-largest of 4,035 power plants in England and the 1,421st-largest of 5,834 in the United Kingdom by capacity; its 21.3 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England850th of 4,035134,434 MW<0.1%
United Kingdom1,421st of 5,834200,500 MW<0.1%
All power plants in our data6,490th of 15,8001,923,633 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 2 data centers and 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted22 km
CityFibre CabinetsData center——34 km
Imperium 315Data center——40 km

Operator and place

More from NextEnergy Solar Fund

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page