Power plant · Colchester, England, United Kingdom

Boxted Airfield

Boxted Airfield is a power plant in Colchester, England, United Kingdom, with 18.8 MW of capacity, operated by NextEnergy Solar Fund.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationColchester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLangham, Colchester, CO4 5NWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Sept 2014 (permit 145101, Town and Country Planning Act, issued by Colchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jun 2014 (reference 145101, planning authority Colchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Sept 2014 (granted, reference 145101, planning authority Colchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNextEnergy Solar FundDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity18.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area20.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9435, 0.9331DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Boxted Airfield is the 657th-largest of 3,430 power plants in England and the 1,210th-largest of 5,050 in the United Kingdom by capacity; its 18.8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England657th of 3,43071,985 MW<0.1%
United Kingdom1,210th of 5,050115,642 MW<0.1%
All power plants in our data4,198th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 145101
  2. Started operating

Nearby

Within 50 km of this power plant: 2 transmission lines and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted8.9 km
CityFibre CabinetsData center——46 km
LionLink InterconnectorTransmission line—Planned50 km

Operator and place

More from NextEnergy Solar Fund

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page