RARE CONTEXT Request research

Owner · Company

Push Energy Limited

Push Energy Limited is linked to 37 assets and rights in the United Kingdom: it operates 36 power plants (12 of them never built) and holds a grid connection.

Portfolio

The 37 assets and rights Push Energy Limited owns, operates or holds, by class, with its role in each, across its 3 records. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.

Power plants 36

Power plantLocationRoleCapacity
Hatton Solar FarmEast Lindsey, England, United KingdomApplicant49.9 MW
Yew Tree Farm, Drointon LaneStafford, England, United KingdomApplicant49 MW
Yew Tree Farm, Drointon LaneStafford, England, United KingdomApplicant30 MW
Kentish Farm 2 - Battery Energy StorageBraintree, England, United KingdomApplicant22.5 MW
Rolleston Park FarmEast Staffordshire, England, United KingdomOperator18.7 MW
Croydon / Church Farm (Royston)South Cambridgeshire, England, United KingdomOperator16.5 MW
Kentish Farm 2 - Solar FarmBraintree, England, United KingdomApplicant16.5 MW
Bassingbourn Solar FarmSouth Cambridgeshire, England, United KingdomOperator14.4 MW
Gosfield AirfieldBraintree, England, United KingdomOperator12.6 MW
Holland RoadTendring, England, United KingdomApplicant12 MW
Sladburys FarmTendring, England, United KingdomApplicant12 MW
Hyde FarmUttlesford, England, United KingdomOperator10.8 MW
Wisbridge FarmNorth Hertfordshire, England, United KingdomOperator9.3 MW
Butlers FarmUttlesford, England, United KingdomApplicant7.7 MW
Birch AirfieldColchester, England, United KingdomOperator5.6 MW
Abbey FarmSouth Cambridgeshire, England, United KingdomApplicant5 MW
Decoy FarmSouth Holland, England, United KingdomOperator5 MW
Hall Farm Solar Farm (Newbold Verdon)Hinckley and Bosworth, England, United KingdomOperator5 MW
Kentishes Solar FarmBraintree, England, United KingdomOperator5 MW
Kingmoor ParkCumberland, England, United KingdomOperator5 MW
Mill FarmEast Hertfordshire, England, United KingdomOperator5 MW
Rectory FarmSouth Cambridgeshire, England, United KingdomApplicant5 MW
Tilbury LCY2Thurrock, England, United KingdomOperator4 MW
London Distribution ParkThurrock, England, United KingdomOperator3.8 MW
Amazon - BHX2North West Leicestershire, England, United KingdomApplicant3.7 MW
Amazon, Symmetry Park - Solar PanelsSwindon, England, United KingdomApplicant3.26 MW
Amazon Boundary WayDacorum, England, United KingdomApplicant2 MW
Amazon LBA2 (Principal Place)Doncaster, England, United KingdomApplicant2 MW
Dunfermline EDI4Fife, Scotland, United KingdomOperator1.9 MW
Kingston ParkHuntingdonshire, England, United KingdomApplicant1.8 MW
Dc1 Boscombe RoadCentral Bedfordshire, England, United KingdomApplicant1.7 MW
Amazon Omega Business ParkWarrington, England, United KingdomOperator1.5 MW
Land at Whatton RoadNorth West Leicestershire, England, United KingdomOperator1.5 MW
Boscombe Road (Unit DC1)Central Bedfordshire, England, United KingdomApplicant1.3 MW
Ricoh UK ProductsTelford and Wrekin, England, United KingdomOperator1.2 MW
Tesco Superstore WisemoreWalsall, England, United KingdomApplicant1 MW

Grid connections 1

Grid connectionLocationRoleCapacity
Bassingbourn Solar (Cokenach Estate) grid connectionEngland, United KingdomHolder12.6 MW

By country

Where the assets and rights are.

Latest events

Dated events about Push Energy Limited and its assets from official notices, registers and owners' press releases, newest first: the latest 8 of 88. All recent changes.

  1. Permit granted: Hatton Solar Farm (planning authority East Lindsey, reference S/079/01078/22)
  2. Permit granted: Hatton Solar Farm (appeal granted, planning authority East Lindsey, reference S/079/01078/22)
  3. Permit applied for: Kentish Farm 2 - Solar Farm (planning authority Braintree, reference 25/01553/FUL)
  4. Permit applied for: Kentish Farm 2 - Battery Energy Storage (planning authority Braintree, reference 25/01553/FUL)
  5. Permit applied for: Yew Tree Farm, Drointon Lane (planning authority Stafford, reference 25/40571/FUL)
  6. Permit applied for: Yew Tree Farm, Drointon Lane (planning authority Stafford, reference 25/40571/FUL)
  7. Permit granted: Amazon, Symmetry Park - Solar Panels (planning authority Swindon, reference S/22/1393)
  8. Permit applied for: Amazon, Symmetry Park - Solar Panels (planning authority Swindon, reference S/22/1393)

Group

Parent company

Push Energy Limited reports no parent company: no known owner (GLEIF LEI).

Partners and counterparties

Owners, operators and grid operators on the same assets.

Facts

FactValueSource
LocationUnited KingdomGLEIF LEI · record · CC0 1.0 · checked 25 Oct 2026
LEI2138002KJ2LGXF21N367Rare Context entity resolution · record · CC0 1.0 · checked 25 Oct 2026
GLEIF LEI · record · CC0 1.0 · checked 25 Oct 2026
Company number08057425GLEIF LEI · record · CC0 1.0 · checked 25 Oct 2026

Also recorded as

Sources name Push Energy Limited under 3 records; this page joins them. Links to any of them lead here.

Name in the sourceIdentifierSource
Push Energy Limitedparty:name:push-energy-limitedUK Power Networks open data portal
PUSH ENERGY LTDparty:lei:2138002KJ2LGXF21N367GLEIF LEI
Push Energyparty:name:push-energyDESNZ Renewable Energy Planning Database (REPD)

Research on Push Energy Limited.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.