Fourstones -Battery Energy Storage is a planned battery storage plant in Northumberland, England, United Kingdom, with 60 MW of capacity, operated by Mespil Solar Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorthumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFourstones, Hexham, NE47 5EADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Aug 2025 (reference 25/02869/RENE, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMespil Solar Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity60 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0230, -2.1895DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Northumberland, reference 25/02869/RENE)

How it compares

Fourstones -Battery Energy Storage is the 343rd-largest of 1,650 power plants planned, permitted or under construction in England and the 618th-largest of 2,548 in the United Kingdom by capacity; its 60 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England343rd of 1,650171,264 MW<0.1%
United Kingdom618th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,624th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 146 grid connections (72 operating, 957 MW), 115 substations, 1 transmission line and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 112 MW grid connection at Carr Edge Farm BESSGrid connection112 MWPlanned0.1 km
Fourstones 20kVSubstation——2.0 km
Fourstones 33kVSubstation——2.0 km
Battery storage and Solar 80 MW grid connection at Fourstones HybridGrid connection80 MWPlanned2.8 km
HexhamSubstation——8.0 km
Biomass 2.5 MW grid connection at HexhamGrid connection2.5 MWOperating8.1 km
Cross Border Connection (England)Transmission line—Planned40 km
Stellium Newcastle CampusData center——44 km