Power plant · Tendring, England, United Kingdom

Land North of Horsley Cross - Solar Farm & Battery Energy Storage

Land North of Horsley Cross - Solar Farm & Battery Energy Storage is a planned power plant in Tendring, England, United Kingdom, with 34 MW of capacity, operated by Mespil Solar Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTendring (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O A120 Horsley Cross, Colchester, CO11 2NRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Jul 2025 (reference 25/01056/FUL, planning authority Tendring)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMespil Solar EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity34 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area57.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9167, 1.0900DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Tendring, reference 25/01056/FUL)

How it compares

Land North of Horsley Cross - Solar Farm & Battery Energy Storage is the 964th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,528th-largest of 3,222 in the United Kingdom by capacity; its 34 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England964th of 2,174185,888 MW<0.1%
United Kingdom1,528th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,857th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 3 transmission lines and 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted19 km
LionLink InterconnectorTransmission line—Planned43 km
Sea LinkTransmission line—Planned49 km
CityFibre CabinetsData center——49 km

Operator and place

More from Mespil Solar Energy

Other power plants in England

All 5809 power plants in England, United Kingdom