Power plant · South Cambridgeshire, England, United Kingdom

Bassingbourn Solar Farm

Bassingbourn Solar Farm is a power plant in South Cambridgeshire, England, United Kingdom, with 14.4 MW of capacity, operated by Push Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Cambridgeshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand adjacent Highfield Farm, Bassingbourn, CambridgeDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Aug 2014 (permit S/0098/14/FL, Town and Country Planning Act, issued by South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jan 2014 (reference S/0098/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Aug 2014 (granted, reference S/0098/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPush EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area25.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0705, -0.0390DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority South Cambridgeshire, reference S/0098/14/FL)
  3. Permit applied for (planning authority South Cambridgeshire, reference S/0098/14/FL)

How it compares

Bassingbourn Solar Farm is the 824th-largest of 3,430 power plants in England and the 1,472nd-largest of 5,050 in the United Kingdom by capacity; its 14.4 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England824th of 3,43071,965 MW<0.1%
United Kingdom1,472nd of 5,050115,622 MW<0.1%
All power plants in our data5,372nd of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 18 data centers (1 operating, 88 MW) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Starwood HouseData center——15 km
West Cambridge Data CentreData center——17 km
Redcentric CambridgeData center——22 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating35 km

Operator and place

More from Push Energy

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page