Power plant · Braintree, England, United Kingdom
Kentish Farm 2 - Battery Energy Storage
Kentish Farm 2 - Battery Energy Storage is a planned battery storage plant in Braintree, England, United Kingdom, with 22.5 MW of capacity, operated by Push Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Braintree (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Kentishes Farm, Kentish Farm Road, Stisted, Braintree, CM77 8BX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 10 Jul 2025 (reference 25/01553/FUL, planning authority Braintree) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Push Energy (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 22.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9056, 0.6080 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Braintree, reference 25/01553/FUL)
How it compares
Kentish Farm 2 - Battery Energy Storage is the 947th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,536th-largest of 2,548 in the United Kingdom by capacity; its 22.5 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 947th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 1,536th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,286th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 7 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bramford to Twinstead | Transmission line | — | Permitted | 20 km |
| NVIDIA Cambridge-1 | AI supercomputer | 202 H100e | Operating | 36 km |
| Kao Data KLON-02 | Data center | — | — | 36 km |
| Kao Data KLON-01 | Data center | — | — | 36 km |
| Imperium 315 | Data center | — | — | 36 km |
Operator and place
More from Push Energy
- Hatton Solar Farm49.9 MW · permitted
- Yew Tree Farm, Drointon Lane49 MW · planned
- Yew Tree Farm, Drointon Lane30 MW · planned
- Rolleston Park Farm18.7 MW
- Kentish Farm 2 - Solar Farm16.5 MW · planned
- Croydon / Church Farm (Royston)16.5 MW
- Bassingbourn Solar Farm14.4 MW
- Gosfield Airfield12.6 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.