Boscar Layby, Raskelf - Solar Panels is a planned power plant in North Yorkshire, England, United Kingdom, with 30 MW of capacity, operated by Sky UK Development Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWest Of Boscar Layby Raskelf, YO61 3NBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 May 2025 (ref. ZB25/00821/FUL, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSky UK Development LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area53.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.1338, -1.2130DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Boscar Layby, Raskelf - Solar Panels is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England991st of 2,174186,088 MW<0.1%
United Kingdom1,569th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 237 grid connections (112 operating, 1,304 MW), 172 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Gas 27 MW grid connection at Boscar Grange GenerationGrid connection27 MWOperating1.6 km
Solar 30 MW grid connection at Village Farm Solar DirectGrid connection30 MWPlanned1.6 km
Solar 4.8 MW grid connection at Husthwaite 33/11kVGrid connection4.8 MWOperating2.6 km
HusthwaiteSubstation——2.8 km
Husthwaite 33/11kVSubstation——2.8 km
Sessay Bridge/SowerbySubstation——8.3 km
Yorkshire GREENTransmission line—Permitted26 km

Operator and place

More from Sky UK Development Limited

Other power plants in England

All 5809 power plants in England, United Kingdom