Power plant · Canterbury, England, United Kingdom
Woodlands Farm, Calcott Hill - Battery Energy Storage
Woodlands Farm, Calcott Hill - Battery Energy Storage is a permitted power plant in Canterbury, England, United Kingdom, with 228 MW of capacity, operated by Sky UK Development Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Canterbury (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | North East Of Woodlands Farm Calcott Hill Sturry, CT3 4NA | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 26 May 2026 (permit CA/25/00418, Town and Country Planning Act, issued by Canterbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 10 Mar 2025 (reference CA/25/00418, planning authority Canterbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 26 May 2026 (granted, reference CA/25/00418, planning authority Canterbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Sky UK Development Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 228 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3318, 1.1331 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Woodlands Farm, Calcott Hill - Battery Energy Storage is the 175th-largest of 2,174 power plants planned, permitted or under construction in England and the 270th-largest of 3,222 in the United Kingdom by capacity; its 228 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 175th of 2,174 | 186,088 MW | 0.12% |
| United Kingdom | 270th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 671st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 5 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Richborough Connection Project | Transmission line | — | Permitted | 7.9 km |
| The Bunker - South East Data Centre | Data center | — | — | 13 km |
| Sota Datacentre | Data center | — | — | 28 km |
| CustodianDC Maidstone | Data center | — | — | 41 km |
Operator and place
More from Sky UK Development Limited
- Newlands Farm, Crewkerne Road - Battery Energy Storage80 MW
- Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System49.9 MW · permitted
- Chediston Hall - 40MW Solar Panels40 MW · planned
- Boscar Layby, Raskelf - Solar Panels30 MW · planned
- Ashby Dell, Border Lane - Solar Farm30 MW · planned
- Somerton Door Farm, Somerton Door Drove - Solar farm20 MW · planned
- Green Lane Solar Park - Solar PV Panels15 MW · permitted
- Merks Hill Farm, Braintree Road - Solar Farm12 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.