Power plant · New Forest, England, United Kingdom

Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System

Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System is a permitted power plant in New Forest, England, United Kingdom, with 49.9 MW of capacity, operated by Sky UK Development Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNew Forest (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Bulls Copse Road, Marchwood Bypass, Southampton, SO40 4UEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Feb 2026 (permit 25/10640, Town and Country Planning Act, issued by New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jul 2025 (reference 25/10640, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Feb 2026 (granted, reference 25/10640, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSky UK Development LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9004, -1.4709DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 214 grid connections (120 operating, 1,125 MW), 188 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Land to the East of Marchwood Bypass grid connectionGrid connection49.9 MWPlanned0.2 km
PV/BESS - 50MW grid connectionGrid connection49.9 MWPlanned0.5 km
Ocean Gate grid connectionGrid connection5.99 MWOperating1.6 km
Marchwood PrimarySubstation——2.0 km
Totton PrimarySubstation——2.5 km
Regents Park PrimarySubstation——2.6 km
Sky ChilworthData center——7.5 km
Regit4uData center——16 km
SCCData center——16 km

Operator and place

Grid connections attached to this power plant

More from Sky UK Development Limited

Other power plants in England

All 5809 power plants in England, United Kingdom