Power plant · Huntingdonshire, England, United Kingdom
Kingston Park
Kingston Park is a cancelled power plant in Huntingdonshire, England, United Kingdom, with 1.8 MW of capacity, operated by Amazon UK Services and Push Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Huntingdonshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Unit 2, Kingston Park, Peterborough, Cambridgeshire, PE2 9EN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 19 Jul 2018 (reference 18/01311/FUL, planning authority Peterborough) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Amazon UK Services (Amazon UK Services / Push Energy) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Push Energy (Amazon UK Services / Push Energy) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.5426, -0.2349 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit expired
- Permit applied for (planning authority Peterborough, reference 18/01311/FUL)
How it compares
Kingston Park is the 2,958th-largest of 3,430 power plants in England and the 4,399th-largest of 5,050 in the United Kingdom by capacity; its 1.8 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,958th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 4,399th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 10,776th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, England (OSM way 87850427) | Data center | — | — | 2.4 km |
| Positive Park | Data center | — | — | 20 km |
| The Horizon Centre | Data center | — | — | 28 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 43 km |
| Kings Lynn B Connection Project | Transmission line | — | Permitted | 45 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 48 km |
Operators and place
More from Amazon UK Services
- Tilbury LCY24 MW
- London Distribution Park3.8 MW
- Amazon - BHX23.7 MW
- MME3, Plot DC1, Integra 61 - Wind Turbine2.3 MW · planned
- Amazon LBA2 (Principal Place)2 MW
- Amazon Boundary Way2 MW
- Dunfermline EDI41.9 MW
- Dc1 Boscombe Road1.7 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.