Grid connection · Scotland, United Kingdom

Ross Priory Hydro grid connection

Ross Priory Hydro grid connection is a planned grid connection in Scotland, United Kingdom, with 4 MW of capacity, held by Absolute Solar and Wind Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceROSS PRIORY HYDRO grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Ross Priory Pumping Stat.)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderAbsolute Solar and Wind LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStrathleven GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date14 Apr 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date28 Jun 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.0534, -4.5506SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Ross Priory Hydro grid connection is the 887th-largest of 1,192 grid connections in Scotland and the 2,840th-largest of 3,903 in the United Kingdom by capacity; its 4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland887th of 1,19288,894 MW<0.1%
United Kingdom2,840th of 3,903446,745 MW<0.1%
All grid connections in our data6,514th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 298 power plants (77 operating, 1,342 MW) and 43 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Blairlinnans Water Treatment Plant, Stirling Road - Solar PV PanelsPower plant1.28 MWCancelled2.1 km
Blairlinnans PrimarySubstation——2.4 km
Auchencarroch Landfill ExtensionPower plant2 MWOperating6.2 km
Auchencarroch LandfillPower plant2.1 MWOperating6.3 km
Drymen PrimarySubstation——7.2 km
Dumfin 11kV NetworkSubstation——8.2 km

Holder, grid operator and place

More from Absolute Solar and Wind Ltd

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page