Owner · Company

Absolute Solar and Wind Ltd

Absolute Solar and Wind Ltd holds 3 grid connections in the United Kingdom, with 22.4 MW of capacity between them.

Portfolio

The 3 assets and rights linked to Absolute Solar and Wind Ltd, by class, with its role in each.

Grid connections 3 · 22.4 MW

Grid connectionLocationRoleCapacity
Edinburgh Airport Solar grid connectionScotland, United KingdomHolder9.2 MW
Edinburgh Airport Solar grid connectionScotland, United KingdomHolder9.2 MW
Ross Priory Hydro grid connectionScotland, United KingdomHolder4 MW

By country

Where the assets and rights are.

Partners and counterparties

Owners, operators and grid operators on the same assets.

Own or advise on any of these assets, or looking to buy? Tell us; introductions are private.

Data on this page