Grid connection · Scotland, United Kingdom

Greenscares Wind grid connection

Greenscares Wind grid connection is a grid connection in Scotland, United Kingdom, with 7.6 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceGREENSCARES WIND grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Braco West Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBraco West GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity7.6 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.2940, -3.9382SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Greenscares Wind grid connection is the 747th-largest of 1,192 grid connections in Scotland and the 2,313th-largest of 3,903 in the United Kingdom by capacity; its 7.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland747th of 1,19288,894 MW<0.1%
United Kingdom2,313th of 3,903446,745 MW<0.1%
All grid connections in our data5,943rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 275 power plants (80 operating, 993 MW) and 49 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Strathallan Wind FarmPower plant20.7 MWUnder construction1.1 km
Shindour - Energy Storage FacilityPower plant49.9 MWPermitted3.3 km
Shindour, Feddal Hill Wood - Battery Energy Storage FacilityPower plant50 MWPermitted3.3 km
Braco West GSPSubstation——3.6 km
Crieff PrimarySubstation——11 km
Dalchonzie PrimarySubstation——11 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page