Greengairs Energy Park grid connection

Greengairs Energy Park grid connection is a planned grid connection in Scotland, United Kingdom, with 68 MW of capacity, held by Downing Renewable Development Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connection site: Cumbernauld)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (Accepted to Connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderDowning Renewable Development Ltd.SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity68 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date20 Sept 2023SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Jun 2032 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Greengairs Energy Park grid connection is the 117th-largest of 1,192 grid connections in Scotland and the 618th-largest of 3,903 in the United Kingdom by capacity; its 68 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland117th of 1,19288,894 MW<0.1%
United Kingdom618th of 3,903446,745 MW<0.1%
All grid connections in our data3,458th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect