Grid connection · Scotland, United Kingdom

Durran Mains Wind RE-Cost grid connection

Durran Mains Wind RE-Cost grid connection is a planned grid connection in Scotland, United Kingdom, with 9.2 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceDURRAN MAINS WIND RE-COST grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Thurso Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity9.2 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date2 Nov 2018SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date5 Jan 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates58.5563, -3.3883SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Durran Mains Wind RE-Cost grid connection is the 713th-largest of 1,192 grid connections in Scotland and the 2,203rd-largest of 3,903 in the United Kingdom by capacity; its 9.2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland713th of 1,19288,894 MW<0.1%
United Kingdom2,203rd of 3,903446,745 MW<0.1%
All grid connections in our data6,125th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 125 power plants (31 operating, 590 MW) and 20 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Oak Tree Cottage, Castletown - Wind TurbinePower plant4.26 MWPlanned0.3 km
Durran MainsPower plant19.5 MWCancelled0.4 km
Hoy FarmPower plant2.3 MWCancelled2.2 km
Thurso South GSPSubstation——7.4 km
Mount Pleasant PrimarySubstation——7.6 km
Hastigrow PrimarySubstation——7.9 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page